Download the publicly available credentials, certifications, patent certificates and honors of Sichuan Kulun Electric Co., Ltd.
Selected credentials, certifications and test reports. Preview or download complete PDF originals. Dates and scope follow the documents; refer to the applicable models and test conditions.
| Document | Pages | Size | Actions |
|---|---|---|---|
| National High-Tech Enterprise CertificateCompany credentials · Issued 2023-12-12; valid for 3 years | 1 | 16.13 MB | Preview · Download |
| ISO 9001 Quality Management System CertificateCompany credentials · 2024-08-29 to 2027-08-28 | 2 | 1.73 MB | Preview · Download |
| ISO 14001 Environmental Management System CertificateCompany credentials · 2024-08-29 to 2027-08-28 | 2 | 1.77 MB | Preview · Download |
| ISO 45001 Occupational Health and Safety Management System CertificateCompany credentials · 2024-08-29 to 2027-08-28 | 2 | 1.76 MB | Preview · Download |
| GJB 9001C Quality Management System CertificateCompany credentials · 2026-05-28 to 2029-05-27 | 2 | 1.09 MB | Preview · Download |
| MS21 Series CCC CertificateProduct conformity · 2024-08-22 to 2029-08-21; includes model annexes | 3 | 2.25 MB | Preview · Download |
| Three-Phase Power Controller SGS EMC Verification of ConformityProduct conformity · Issued 2024-11-28; applicable models in annex | 2 | 0.39 MB | Preview · Download |
| Three-Phase Power Controller SGS Low Voltage Verification of ConformityProduct conformity · Issued 2024-12-03; APR3/APR3L models in annex | 2 | 0.40 MB | Preview · Download |
| ST200/ST300 Series CE AttestationProduct conformity · Registered 2022-10-13; expiry 2027-10-12 | 1 | 0.04 MB | Preview · Download |
| STPR/SMART Series CE AttestationProduct conformity · Registered 2022-10-13; expiry 2027-10-12 | 1 | 0.04 MB | Preview · Download |
| Deyang Enterprise Technology Center Recognition ListCompany credentials · 18th batch; recognition-list document | 1 | 0.16 MB | Preview · Download |
| HV Power Control Cabinet Test Report - Revised G1Test and verification reports · 2025-10-16; APR3L-HV-10kV/600A; insulation performance | 25 | 2.48 MB | Preview · Download |
| HV Switchgear Test ReportTest and verification reports · 2025-10-10; KYN28-12/630 | 47 | 5.98 MB | Preview · Download |
| HV Soft-Start Cabinet Test ReportTest and verification reports · 2025-09-29; MS31-HV-500kW 10kV; insulation performance | 24 | 2.50 MB | Preview · Download |
| Three-Phase Power Controller SGS RoHS Verification Report (Chinese)Test and verification reports · 2023-04-06; report CANEC2303323704 | 34 | 13.85 MB | Preview · Download |
| SGS EMC Technical Verification ReportTest and verification reports · IN-SC-5805-TF24047-E; supporting report | 35 | 3.13 MB | Preview · Download |
| SGS Low Voltage Technical Verification ReportTest and verification reports · IN-SC-5805-TF24047-S1; supporting report | 85 | 1.59 MB | Preview · Download |
For additional qualification documents, please contact us. You can also browse our Honors page.